Reality Fan Forum - The Amazing Race Spoilers - Big Brother Live Feed Updates - Survivor Spoilers - Reality TV Spoilers - Big Brother Spoilers
The Amazing Race International Versions => TAR Asia => Topic started by: tarflyonthewall on October 22, 2008, 11:34:05 PM
-
So, in an attempt to finally get some timelines for TAR Asia on the internet, I wound up downloading the old episodes I could find and doing them myself. They're not all done at the moment, but they should generally be updated fairly soon (for seasons 1 and 3 especially, season 2 may take a little longer because I've gotta wait until the next repeat on my "satellite" channel).
TAR Asia Timelines (http://www.realityarchive-amazingrace.blogspot.com)
-
So, in an attempt to finally get some timelines for TAR Asia on the internet, I wound up downloading the old episodes I could find and doing them myself. They're not all done at the moment, but they should generally be updated fairly soon (for seasons 1 and 3 especially, season 2 may take a little longer because I've gotta wait until the next repeat on my "satellite" channel).
TAR Asia Timelines (http://www.realityarchive-amazingrace.blogspot.com)
Thank you, this is pretty useful :hearts:
-
Thank you so much. I've just uploaded Legs 4, 5, 6, and 7 of TAR Asia 1, and the rest of that season should be up in a few days. I've tried not to be as sarcastic as I normally would be writing these, considering the reaction it got the last time I did it like that, but I probably failed miserably.
-
Okay, all of Season 1 has been done and added, as well as the first two episodes of Season 2. I've found a few different blogs around the place which have allowed me to work out most of the rest of that season (but not all), and those should be up whenever I can get around to it.
-
I've gotten all of TARA2 written up, except for the following information I couldn't find anywhere. If you can help, please do:
- Money given for Legs 4 (Rotorua), 5A and 5B (Japan and Busan), 6 (Korea), 9 and 10 (the two Hungary legs), and the finale
- The hint for the zipline RoadBlock
- Daichi/Sawaka's departure time for Leg 3 (Hong Kong/Auckland)
- Arrivals at Central Pier and Standard Chartered Bank (Leg 3, Hong Kong), the Tirau Caltex (Leg 4, Rotorua), and the Old Opera House in Frankfurt
- Completion orders for the sledging and agrojet tasks in Leg 4 (Rotorua), and the tae kwon do task and lock/key RB (both Leg 5B, in Busan)
Edit: Since I'm doing these in order, the quicker I can get this sorted out the quicker I can get TARA3 out of the way.