Archive > The Amazing Race 12 Archive

EP3: 'Please, Lord, Give Me Milk !'

<< < (20/57) > >>

Slowhatch:
I certainly looks like a train ride. The editing in the promo would have us think they arrive in Ouaga by train, but I agree with the others that's unlikely. Maybe just a trip to the "suburbs." It would have been no trouble for the producers to fly people/livestock in from any part of the country for a milk-and-mask show.

apskip:
There is a Mossi village near the capital city on the road to Bobo-Diaoulasso. Here is a photo of it:  Mossi Village in Ouagadougou If this turns out to be a site for AR12 tasks, teams will be heading west out of Ouagadougou rather than east as I have predicted. The train line also runs there.

From Bobo-Diaoulasso there are 3 basic alternatives to reach international air transportation:
1. return to Ouagadougou
2. Go about 300 miles south to Abidjan, Ivory Coast, which is a much bigger airport hub than OUA. The flights from there to CDG have been detailed in the Locations thread.
3. Bobo-Diaoulasso itself has a small airport that presumably has flights to OUA and ABJ.

mswood:

--- Quote from: Michael D on November 14, 2007, 05:55:56 PM ---Common CBS! I need more hints so I can get a good score this week =/

--- End quote ---
:pull (:;) :dick

puddin:
"Please Lord, Give Me Serenity now!"  :pull

Can we focus on the tasks?

apskip:
Here is some more information on railroads in Burkina Faso. Some of this may already have been presented by Peach, I don't remember.

The 510-km (317-mi) Mossi Railroad in Burkina Faso is part of the line that begins at Abidjan, Côte d'Ivoire, and ends in Niger, some 1,145 km (710 mi) away. The line serves the towns of Banfora, Bobo-Dioulasso, Koudougou, and Ouagadougou; 25–40% of the railway traffic passes through Burkina Faso, where total rail trackage was 622 km (386 mi) in 2002. Planning for the construction of a railroad from Ouagadougou to Tambao (353 km/219 mi) to exploit the mineral deposits in the area was begun in October 1981. Constructed by volunteers, the line reached Donsin, 33 km (21 mi) from Ouagadougou, in 1987, and the second stage to Kaya (77 km/48 mi) was completed by 1991.

Note that the above information is not consistent. If there is only 386 miles of track, the 317 miles which gets from the western border of Burkina Faso to Ouagadougou will only leave 69 miles. That will not come anywehere close to reaching the border with Niger to the east

EDITOR's NOTE - Further research indicates that the lien ends in Kaya north of Ouagadougou and does not get anywhere near Niger. Also, that research has turned up this statement from the website of thte holding company that owns SITARAIL:

Railway operations has been severely disrupted due to the current political unrest in the Ivory Coast. Various attempts have been made to restore the operations but these proved extremely difficult. The border between Ivory Coast and Burkina Faso has also been closed at different intervals depending on stability in the Ivory Coast.

The company is confident that operations could return to normal as soon as peace has returned to the region.

This totally supports the information PEACH received and presented, but does not mean that some rail services cannot operate within Burkina Faso. The question is where would AR12 want to go?


Navigation

[0] Message Index

[#] Next page

[*] Previous page

Go to full version